House construction in Ghaziabad, run by the engineer who quoted it.

Rates published before you call. Scope fixed before the advance. We take four to six homes a year, which is how the person who priced your build stays the person standing on your site.

A plot at structure stage in evening light: cast RCC columns standing across the site, column shuttering being set, the crew mixing and placing concrete, and brick stacked ready for the walls.
Columns up, shuttering going on, the crew working the mix. This is the stage that decides whether the house is sound.
BRIKSART PROJECTS Turnkey residential construction · Ghaziabad & Noida
Structure
₹1,100
per sq ft, ex-GST
Essential
from ₹1,650
per sq ft, ex-GST
Engineer
Saurabh Pandey
B.Tech Civil. Seven years in the trade, the first three auditing other builders' BOQs.
Capacity
4–6 homes a year
By design, not by limit
Delivered
25+ projects
Delivered across Ghaziabad and Noida
Rated
Every one from a real build

The people we build for have these things in common

Not budget. Not plot size.

They live far from the plot

Different city, different country, same worry.

They stopped believing adjectives

"Premium quality" is not a specification. A brand name is.

They want it on record

Steel before concrete, conduit before plaster. Photographed, not promised.

Two quotes, no way to compare them

Different exclusions, identical surprise in month six.

Beam reinforcement cages with closely spaced stirrups, tied in position over the shuttering before the concrete pour.
Steel checked against the drawing, before the pour
A newly cast slab flooded with water for curing at dusk, the column starter bars and the skyline reflected in the still surface.
The slab kept under water for the full curing period
Brick wall with electrical conduit runs, switch boxes and pipe routes fixed in place, photographed before plaster covers them.
Every wall photographed before plaster closes it

Photographs like these go into the weekly report, whether or not anyone asks for them.

Two packages, both rates published

The structure, waterproofing and concealed plumbing are identical in both. Only the finish scope changes.

Shell only

Structure

₹1,100 /sq ft
  • Foundation to plaster. RCC frame, brickwork, internal and external plaster
  • OPC 53 cement, Fe500D steel throughout, M20 or M25 per your structural drawing
  • Finishes stay with you, on your own timeline and budget
Where most clients build

Essential

Starting from ₹1,650 /sq ft
  • Everything in Structure. Same cement, same steel, same mix, same plaster
  • Move-in ready. Waterproofing, flooring, doors, wiring, fittings and paint
  • Drawings and GDA sanction prepared, submitted and followed up
A finished living and dining room: tiled floor, false ceiling with cove lighting, wallpapered feature wall and a built-in crockery unit.
Essential, at handover week: floor, ceiling, lighting and joinery in
A room with internal plaster complete, the beam and slab soffit exposed and switch boxes set flush into the wall.
Structure, at handover: plaster on, and the finishing left to you

Both rates exclude GST at 18%, and assume a 200 sq yd plot, ground plus one, under standard site conditions. Your final rate is confirmed by an itemised BOQ after a site survey. Not before.

What would these rates mean for your plot?

Send four details and we'll come back with an indicative figure, and what sits outside the rate on your site.

Contractor, Briksart, or a national builder

All three build houses. They fail in different places. Here's where each one actually wins.

Local contractorBriksartNational builder
Headline rateLowestMidHighest
Who quoted your buildThe contractorThe engineer who will run your siteA sales executive you'll never meet again
Scope in writingRarely. Just a rate per sq ftItemised BOQ and brand-level specificationYes, standardised
If the slab is wrongArgument over who decided itOne named engineer is accountableEscalation through a ticket queue
Who you reach at 9pmUsually the contractorThe founder, directlyA support line, next working day
Rate changing mid-buildCommon. Escalation gets passed onFixed. We absorb the escalationFixed
Projects running at onceVaries, often many4–6 a year, by designThousands
Structural warrantyInformal or none20 years, in the contractFormal, usually 10 years

If your only constraint is the lowest possible number, a local contractor will beat us, and we'll tell you so. We're built for owners who can't be on site every day and need the build documented.

Homes we have built

Committed against actual timelines, and what changed mid-build.

Want your house on this page next?

Tell us about the plot. Quoting costs nothing, and you'll be speaking to the engineer who would build it.

What clients have written

Posted on Google, under their own names. Every review we have is public. Read all 25, including the ones that aren't five stars.

★★★★★
We contacted briksart projects last year in November for house construction. They delivered our house in said time and budget. Their way of work is very professional and communication is clear and fast. Aap apne ghar ke liye briksart team pe trust kr sakte. Unka sare steps documented hote jisse aapka trust bna rehta h. Would recommend their service.
Shubham AroraGoogle review
★★★★★
Had a great experience with briksart team. Our house construction at wave city, ghaziabad was delivered with said deliverables prior to the construction phase. The documentation and proof driven process created trust. Very accountable and output driven team.
Yuvraj SinghGoogle review · Wave City, Ghaziabad
A cast slab still carried on timber props, with a stripped concrete column standing clear and beam reinforcement laid out alongside.
A cast slab with the props still in, waiting out the curing period
Inside a house mid-build: brick walls under a cast slab, conduit run down the columns, door openings formed and cement stacked clear of the floor.
A house part way through. We would rather walk you around one of these than a showroom.

Tell us about your plot

Quoting costs nothing. Send the locality, the plot size and whether you've got drawings yet, and we'll come back with what it costs and what happens next.

  • An indicative figure for your plot, against the published rates above
  • What is in scope and what is not, before anyone talks about money
  • Where you are in the process, whether that's drawings, sanction or ready to build
  • A straight answer on whether we're the right fit, including when we're not

Tell us about your plot

Quoting costs nothing. Only the first four are needed. The rest just makes our first reply more useful.

We use this only to reply to you. No lists, no forwarding to anyone else.